Milestone occurred today I finally got to take a shower!!! I feel soooo clean! This is the foot after the shower. I did not realize how swollen it still was. I get to start wearing a shoe, and will start increasing the time I wear it everyday. I see the Doctor in 3 weeks. Still no working, or driving.
Here is the tile It is hard to see because it is so dusty. It looks very good real natural and it will look good with the pebble sheen we selected. The tile is blue and browns. the bottom picture is the start of the prep work for the pavers. I think that they get placed tomorrow.
This morning I awoke to pounding out back. The decking is now poured. They started at 06:00 am and left at 11:00 am and walla! now there is decking around the pool
Today two workers come out, first they painted the whole slide,rocks and decorative rocks black. I think it was to define the rocks and lines, then they painted the slide and all the rocks brown. Looks great. Water will flow out of the top area and make a waterfall,and people can slide down the slide.